5 capacity signals observed across monitored records. Every finding is verified before publication. Evidence packs are provided to subscribers.

5Movements detected
273 GWGate 1 + Gate 2 register capacityGeneration and storage projects classified Gate 1 or Gate 2 in the TEC register; excludes transmission-connected demand and blank-gate entries. Gate 1 does not reserve capacity or a queue place. This narrower measure replaces Issue 001's broader total.
GBTransmission + distribution
Network Capacity 9 July 2026
COEDPOETH T1 (substation)
SP Manweb, Merseyside & North Wales
Demand connection capacity at this substation is published as Red-constrained, already 0.4MW over-subscribed against firm capacity. Any project expecting to connect on the demand side here faces a constraint as of the current publication.
Verified · evidence pack on file Request evidence →
Network Capacity 9 July 2026
RHYDLYDAN GT1 (substation)
SP Manweb, Merseyside & North Wales
Generation connection capacity at this substation is published as Red-constrained. Any project expecting to connect on the generation side here faces a constraint as of the current publication.
Verified · evidence pack on file Request evidence →
Network Capacity 9 July 2026
SANKEY BRIDGES GT1 (substation)
SP Manweb, Merseyside & North Wales
Demand connection capacity at this substation is published as Red-constrained, already 1.0MW over-subscribed against firm capacity. Any project expecting to connect on the demand side here faces a constraint as of the current publication.
Verified · evidence pack on file Request evidence →
Network Capacity 9 July 2026
NESTON T1 (substation)
SP Manweb, Merseyside & North Wales
Generation connection capacity at this substation is published as Red-constrained. Any project expecting to connect on the generation side here faces a constraint as of the current publication.
Verified · evidence pack on file Request evidence →
Network Capacity 9 July 2026
OPTICAL FIBRES T1 (substation)
SP Manweb, Merseyside & North Wales
Generation connection capacity at this substation is published as Red-constrained. Any project expecting to connect on the generation side here faces a constraint as of the current publication.
Verified · evidence pack on file Request evidence →

Monitor the projects that matter to you

The Pulse is the market picture. Your subscription is your deal picture — named projects, weekly status confirmation whether or not anything changes, and an alert the day it does.

Here’s what Cairnel currently knows about one of the largest projects in the queue: Kilmarnock BESS fact sheet →

Submit three projects for a coverage check →

Monitor tier from £300/month · payment link sent after coverage review · View plans

Coverage reflects records Cairnel had matched as at 11 July 2026.

Public-data acknowledgements

Cairnel uses multiple sources to build the picture. Some of the public ones that need referencing are SP Energy Networks.

  • SP Energy Networks SC389555, Capacity Heatmaps Information Model SPM, source dataset, CC BY 4.0. Cairnel selected and reformatted the source observations. The source information is provided without warranties.

Cairnel launched in July 2026. This is Issue 002. The Pulse is produced weekly — every item is verified before it appears here. We are early and we know it. If something looks wrong, or you want to suggest a project we should be watching, write to us: hello@cairnel.co.uk