01

Connection queue

Movement in a project's position in the grid connection queue — the core signal for infrastructure investors and lenders.

  • Gate stage changes (Gate 1 to Gate 2 and beyond)
  • Connection offer issued or accepted
  • Queue position shifts
  • Capacity request changes
  • Project withdrawal or suspension
  • Connection date revisions

02

Capacity and constraint

Changes in what the network can accommodate at the substations and connection points relevant to your projects.

  • Firm capacity availability changes
  • Constraint status updates
  • Headroom threshold movements
  • New connection offers at monitored substations
  • Network reinforcement decisions

03

Company events

Corporate activity at the entities behind the projects you track — ownership, leadership, and filing status.

  • Ownership and beneficial control changes
  • Director appointments and resignations
  • Charge registrations and satisfactions
  • Confirmation statement and accounts filing status
  • Dissolution or striking-off notices
  • Corporate restructuring events

04

Planning decisions

Major infrastructure consenting plus local planning-application evidence where the relevant authority is covered.

  • Application submissions
  • Local planning decisions in Adur, Camden, Doncaster and Worthing
  • Appeal outcomes
  • Development Consent Order stage changes
  • Environmental assessment submissions

Where Cairnel monitors

Coverage is national across transmission and expanding across distribution. Cairnel states gaps honestly — we do not claim coverage we do not have.

Network layer Geography Status
Transmission connection queue GB-wide (England, Scotland, Wales) Live
Distribution — London, South East, East of England London, South East, East of England Live
Distribution — South Scotland, Merseyside, North Wales South of Scotland, Merseyside and North Wales Live
Distribution — North West England North West England Live
Distribution — North East England, Yorkshire North East England, Yorkshire Live
Distribution — Midlands, South West, South Wales Midlands, South West, South Wales Coming
Company events England and Wales registered entities Live
Major infrastructure consenting Nationally significant infrastructure register Live
Local planning applications Adur, Camden, Doncaster and Worthing LPAs only; explicit coverage gaps elsewhere Limited

What triggers an alert

Cairnel does not send raw data. Every finding goes through a verification step before it reaches a subscriber. That means confirmed change events only — not noise, not false positives from data refresh artefacts.

An alert is sent when Cairnel detects a verified change for a project on your watchlist. The alert names the project, states what changed, and gives the date the change was detected. Findings are traceable.

Missing evidence is not adverse evidence. If Cairnel cannot confirm a change, it does not report one. Coverage gaps are stated plainly — we do not impute status from absence of data.

Full coverage disclosure

For private beta subscribers, we publish a more detailed statement of what is monitored, what is not yet monitored, update frequency, and confidence tiers.

Full coverage disclosure →

What Cairnel does not currently show

273 GW

Gated generation & storage queue monitored

~99 GW

Transmission-connected demand — not currently shown

The 273 GW figure covers generation and storage projects holding a formal queue position. It does not include transmission-connected demand — large electricity consumers seeking a grid connection, such as data centres, industrial facilities, and hydrogen producers. These projects represent a significant and growing share of the GB transmission connection pipeline.

The gap is structural, not accidental. No public register of named transmission demand connection projects exists in a form equivalent to the generation queue. The figure widely cited for this segment is drawn from a self-reported exercise conducted by the network operator — useful context, but not a project-level list Cairnel can independently verify and monitor.

Cairnel is building an independently evidenced picture of transmission-demand developments — named projects, connection sites, and network investment signals — without relying on incomplete official totals as denominators. We will state what we can evidence, attribute confidence to each record, and expand coverage as evidence becomes available.

Cairnel does not claim completeness on either side of the queue. Where we know the boundary of what we can see, we say so. The absence of a figure is never reported as the absence of activity.

Submit three projects for a coverage check

Send us three project names and we will confirm what Cairnel can monitor.